Rising river alert – Snowy River below Jindabyne Dam
21 July 2026
The NSW Department of Climate Change, Energy, the Environment and Water is issuing a rising river alert for the Snowy River between Jindabyne Dam and Dalgety in southern NSW for Tuesday 28 July 2026.
The river will rise due to the first high-flow event in a series of three planned ‘high-flow’ environmental releases from Jindabyne Dam to the Snowy River during 2026.
A daily flow volume of 2,430 megalitres will be released over 24 hours from Jindabyne Dam from midnight (00:00am) on Tuesday 28 July.
The release will include a peak flow rate equivalent to 3,000 megalitres per day for the eight-hour period between 8am to 4pm.
The flow rate will drop to a target of 920 megalitres per day on Thursday 30 July.
It is expected the river level at Dalgety will rise by approximately 0.3 m, although rainfall or wet condtions in the catchment may further increase flow rates and water depths.
While the environmental benefits from this release are expected to be greatest between the dam wall and the junction with the Delegate River, the flow pulse will be noticeable well down into Victoria. Natural tributary inflows will also contribute to water levels as the pulse moves down the Snowy River.
Water released from Jindabyne Dam may take approximately 8 to 11 hours to reach Dalgety Weir at this flow rate and around 3 to 4 days for the flow to arrive at Orbost in Victoria, subject to catchment conditions.
Landholders downstream of the Jindabyne Dam are advised to take all necessary precautions with stock, fencing and property in proximity to the river.
As the release flows through the system, people should refrain from entering or crossing swollen waterways.
Conditions will be closely monitored in the lead up to the release. Planned flows may be modified or cancelled subject to weather, environmental or operational conditions nearer to the time of release.
We will work closely with the NSW State Emergency Service and the Bureau of Meteorology to provide information to the community regarding the management of this release if required.
More information can be found at: Snowy River increased flows
Other news
A landmark investment in Eurobodalla’s water future has been delivered, with the completion of the Southern Storage Facility dam strengthening drought resilience and improving water security for the region for decades to come.
A major water efficiency project in the Riverina is locked in, with the Albanese Government investing $110 million to upgrade critical irrigation infrastructure and recover billions of litres of water for the environment.
The NSW Department of Climate Change, Energy, the Environment and Water is issuing a rising river alert for the Snowy River between Jindabyne Dam and Dalgety in southern NSW for Thursday 10 September 2026.