Investigations into Tamworth’s water future complete
The NSW Government has completed major investigations into the Tamworth future water security options.
Previously intervalley pipeline and off-river storage was identified as possible project options during development of the Namoi Regional Water Strategy.
The NSW Government has now completed a Preliminary Business Case (PBC), which investigated a number of potential infrastructure options, to ensure all were thoroughly considered.
Whilst the PBC has recommended a pipeline from Keepit Dam to Tamworth as the preferred major infrastructure option, the Minister for Water has instructed that work towards a Full Business Case (FBC) not continue.
This decision was based on the significant objections to this proposed solution from downstream communities and water users, and the costs associated with the proposal.
Further work to make the project construction ready, including an FBC, is estimated to cost $13.6 million, with the final project likely to cost over $340 million.
Delivery of a FBC and construction of major infrastructure solution would also have taken years, while communities needed practical solutions much sooner when drought conditions start to emerge.
The NSW Government will instead pursue other, more practical and cost-effective options available, which do not have as significant an impact on other communities downstream of Tamworth.
That includes requesting Water NSW commence the necessary approvals to enable the future operation of the existing Chaffey Pipeline as a priority.
The NSW Government has also ruled out progressing a proposal to build an Advanced Water Treatment Plant to create recycled water for industrial use, as the FBC found it would not deliver enough water security benefits to justify the investment required.
The NSW Government is already delivering practical water savings measures across Tamworth, including the $55 million Calala to Dungowan pipeline, completed in partnership with the Australian Government in mid-2023 that is helping to save up to 2.2 ML of water per day. The Active Leak Detection Project is delivering a further 115 megalitres in annual water savings.
The NSW Government will continue to monitor conditions, water availability and emerging drought risks across the region.
The following documents provide an overview of the investigations undertaken, key findings and recommendations:
About the project
The Tamworth Intervalley Pipelines and Off-River Storages Project involves the delivery of a preliminary business case to identify and assess options to improve Tamworth region’s water security and support a growing regional economy.
The department’s Water Group will consider options which were identified in previous assessments and the Namoi Regional Water Strategy.
Options being considered include:
- construction of a small off-river storage (up to 10 gigalitres) upstream of Tamworth. Water will be extracted from the Peel River at Paradise Weir, with a pump station and a pipeline capacity of 100 megalitres per day for transfers to and from the storage.
- construction of a new pipeline and pump stations to transfer water from the Manning River catchment to Chaffey Dam, including a new weir on the Barnard River.
- construction of a new pipeline and pump stations to transfer water from Keepit Dam to Calala Water Treatment Plant.
- construction of a new pipeline and pump stations to transfer water from Split Rock Dam to Calala Water Treatment Plant.
These options are aligned with the Tamworth Water Security Plan being developed by the Tamworth Regional Council, and the department’s Namoi Regional Water Strategy.
The Preliminary Business Case is a high-level assessment of the feasibility of different options to determine if any of the options should progress to a more detailed Full Business Case. This will inform funding decisions for further investigations.
Project need
Currently, Tamworth faces risks of water shortages during severe droughts, with the potential for high or persistent water restrictions. The town's water supply relies heavily on rainfall and is thus vulnerable to climate change. For Tamworth to continue to grow, communities and businesses require confidence that water sources are reliable and able to support future demand.
Project benefits
If the project is approved, it would benefit the region by:
- improving Tamworth’s town water security
- providing sustainable water supplies to support Tamworth’s population growth
- support increased economic development and diversification in the Tamworth region.
Map of project investigation areas.
Download the map (PDF. 2,600KB)
Stakeholder engagement
The Water Group is committed to building and maintaining respectful, trusted and collaborative relationships with our communities and stakeholders to ensure water infrastructure projects achieve the best possible outcomes.
We will offer opportunities for communities and stakeholders, including First Nations people, to engage with us and provide feedback as we develop the preliminary Business Case for the project.
The Preliminary Business Case uses technical studies and stakeholder feedback to assess the options.
Community members and stakeholders were invited to learn more about the project and provide feedback during 2024 and 2025.
Recordings of webinars for our irrigation community as well as broader community members are below.
Timeline
-
Quarter 4 – 2024
Introduction
We introduce the project to key stakeholders.
-
Quarter 4 – 2024
Key stakeholders’ consultation
We invite the input of key stakeholders.
-
Quarter 1 – 2025
Drafting the Preliminary Business Case
We consider all input and our detailed studies to prepare the business case.
-
Quarter 1 – 2025
Community consultation
We invite the input of the community on the project.
-
Quarter 2 – 2026
Finalise the business case
We finalise the business case.
Summary business case
All major infrastructure investment decisions taken by the NSW Government are required to be supported by a business case.
As part of our commitment to being open and transparent, this summary business case provides key information and ensures commercial and other sensitivities are managed appropriately.
Download the Summary business case
What we heard
A What we heard report capturing feedback from community engagement between 2024 and 2025 is now available.
The report outlines responses from key stakeholders, First Nations groups and the broader community to the four options being explored as part of preparing the Preliminary Business Case.
The report includes:
- an overview of the engagement process and participation by community and stakeholders
- a summary of what we heard on key options proposed and our responses to the feedback received.
Report
The report summarises the key themes and issues raised by community members and stakeholders and explains how this feedback is being considered for the Preliminary Business Case.
Subscribe for updates
Sign-up for updates about the Tamworth Intervalley Pipelines and Off-River Storage Project.
Contact us
For more information call us on 1300 081 047 or email us at water.enquiries@dcceew.nsw.gov.au