Menindee Lakes Project

Options to reduce the substantial evaporation losses from stored water in the Menindee Lakes system.

Main Weir at Menindee

Menindee Lakes Project withdrawal

The Basin Officials Committee has approved the withdrawal of the Menindee Lakes Water Savings Project from the Sustainable Diversion Limit Adjustment Mechanism (SDLAM) measures framework.

The withdrawal means the project will not proceed and the anticipated water savings will not count towards the NSW Government’s Sustainable Diversion Limit (SDL) offsets under the Murray-Darling Basin Plan.

The original Menindee Lakes Water Savings Project involved new options for infrastructure and operational, regulatory and adjustment measures to improve the efficiency of the Menindee Lakes system. 

The project also aimed to contribute to overcoming system constraints to increase flexibility in the delivery of environmental water and enhance both instream and overbank outcomes in the Lower Darling, Great Darling Anabranch and downstream in the River Murray. 

The original scope of the project, particularly the reconfiguration of infrastructure to generate evaporative water savings, was not supported by the Menindee community. 

As a result, the project was rescoped to consider alternatives to the original proposal.

The NSW Government investigated 3 initiatives as part of the rescope, though only the North-South environmental water protection connectivity trial could be delivered by the December 2026 Basin Plan deadline.

To satisfy SDLAM requirements, the trial arrangements for this project needed to be enduring. However, other Basin States did not support embedding the trial arrangements into operating frameworks. 

As a result, no element of the rescoped project could proceed, and the Basin Officials Committee approved its withdrawal.

While the project has been withdrawn, it is important to note that, of the 22 components of the original Menindee Lakes Water Savings Project, 5 have been completed, 2 are currently progressing and a further 2 are continuing through other pathways separate to SDLAM.

The NSW Government will not be revisiting the Menindee Lakes Water Savings Project. Future operating arrangements are being considered through the Murray-Darling Basin Authority-led operational review, which NSW is participating in.

Community engagement

The NSW Government carried out a comprehensive program of engagement with the local community and sought input from key governance groups including the Menindee Lower Darling Stakeholder Advisory Group and Technical Advisory Group to explore options for the project and ensure local knowledge was considered.

Community engagement included engaging with the Barkandji people to ensure their cultural and spiritual connection to water was understood, respected and integrated into project development. The Menindee Lakes, Darling Barka River and Great Darling Anabranch are rich in cultural and archaeological significance. As Traditional Owners, the wisdom and experience of the Barkandji people is critical to informing any potential project on their land.

Other activities along the Lower Darling-Baaka River

Minindee lakes at sunset with a silhouette of three trees

Information and updates on the ongoing monitoring and management of fish deaths in the Lower Darling-Baaka River at Menindee and downstream.

Darling River near Pooncarie

To improve connectivity between the northern and southern Murray–Darling Basin, environmental inflows from the Barwon-Darling will be protected from extraction into Menindee Lakes and through to the Murray under trial arrangements until 30 June 2028.

Fishheart unit work on a river with infrastructure in the water and on the banks

The fishway trial is testing innovative technology that can help provide fish passage, while effective permanent solutions for the Lower Darling-Baaka are being developed.

Contact us

For more information call us on 1300 081 047 or email us at water.enquiries@dcceew.nsw.gov.au